Project - Tarmac Limited
First Floor Offices, Ravenscroft Court, Buttington Cross Enterprise Park, Welshpool, Powys, SY21 8SL
Company No: 0458 3869
Our Services include:-  Full Design & Build Packages, Industrial and Commercial Buildings,  
Home Page Home Page About Us About Us Recent Projects Recent Projects Services Services Health & Safety Health & Safety Contact Us Contact Us
Click thumbnail to enlarge
Specialists in all aspects  of Industrial and  Commercial Construction
Telephone: 01938 558800 Fax:01938 558844
Nationwide Service - Any type or size of project undertaken
Copyright: 2011
Tarmac Limited, Tallington – “Project Penguin” This project, for a multi-national building and quarry products company, was very challenging in many ways The requirement was no install a steel support frame, within an existing structure, to carry a complex high speed concrete delivery system.  The new frame was to be installed within 60mm tolerances of the existing structure The existing building was clad in asbestos cement material, therefore any contact with or removal of this material was not an option The existing floor surfacing was to be replaced with new reinforced concrete slabs, all of which contained complex steampipe and drainage systems We were able to deal with all of these challenges, again delivering the project on time.  C21 were also awarded further works during the project, to the building cladding and materials loading silos Tarmac Limited display a zero tolerance approach to Health & Safety, in that any breach of rules results in dismissal from site.  This project was completed successfully, with no such breaches.  C21 Construction carries out work throughout the UK for Tarmac Limited, consisting of asbestos cladding works, new-build projects, general maintenance and dilapidation works, and as such is considered an approved contractor