Project - Dunster House
First Floor Offices, Ravenscroft Court, Buttington Cross Enterprise Park, Welshpool, Powys, SY21 8SL
Company No: 0458 3869
Our Services include:-  Full Design & Build Packages, Industrial and Commercial Buildings,  
Home Page Home Page About Us About Us Recent Projects Recent Projects Services Services Health & Safety Health & Safety Contact Us Contact Us
Case Study - Dunster House, Warminster
Click thumbnail to enlarge
Specialists in all aspects  of Industrial and  Commercial Construction
Telephone: 01938 558800 Fax:01938 558844
Nationwide Service - Any type or size of project undertaken
Copyright: 2011
Our client contacted us having already obtained planning permission, and was keen to commence and complete the project quickly. The project involved full site development, including a 1,000m2 storage and office building, extension site preparation and tarmac surfacing works, all site drainage and perimeter fencing Since project completion was of significant importance, composite panel cladding systems were used throughout to secure the building envelope as quickly as possible.  The air testing of the building on completion showed an actual rate achieved 70% better than minimum standards for Building Regulations at the time of construction The ground conditions were not found to be adequate, therefore the foundations were quickly adapted to a “raft” style construction method.  The completion date was not affected by this alteration