Case Study - Blue Machinery Spares Ltd, Warrington
Click thumbnail to enlarge
Specialists in all aspects  of Industrial and  Commercial Construction
Telephone: 01938 558800 Fax:01938 558844
Nationwide Service - Any type or size of project undertaken
Copyright: 2011
Having successfully over-clad the existing building on site, C21 were awarded the contract to construct a new storage, workshop and welfare facility Since the existing site was already laid to concrete, we quickly identified a cost saving scheme, using this surface to build upon, rather than installing new.  This represented a substantial cost saving of over several thousand pounds.  The building perimeter was weather proofed using a cast reinforced concrete upstand. The client was anxious to complete the project quickly, therefore a composite panel system was specified, to maximize the construction speed. The internal welfare facility consists of toilets, canteen, showers and changing rooms, and is located within the building fabric to maximize use of the building footprint. The project presented a design challenge in that the rear gable and side walls were “scewed” to make best use of the space available on site.  All steel work arrived to site was pre-fabricated and was successfully installed without alteration